Fig

34 Products

  • ABB DS203NC C20 A300 Fehlerstrom Schutzschalter mit Überstromschutz - NeueEnergie24

    ABB Fig. DS203NC C20 A300 fault current circuit breaker with overcurrent protection

    2-4 working days  Delivery time depending on the product. The freight forwarding goods longer after appointment. Order goods are only ordered from the manufacturer and can therefore be delayed.

    FI/LS switches (RCBOS) offer personal and material protection as well as protection against electrically ignited fires in accordance with DIN VDE 0100-410 and DIN VDE 0100-530. They ensure protection of three single-phase or three-phase current circles against overload and short-circuit currents, protection for sinus-shaped alternating currents and pulsating streams with a smooth proportion of the same error of up to 6 mA to earth. As well as error protection (protection for indirect touch), additional protection (with iδn ≤ 30 mA) and fire protection (with i∆n ≤ 300 mA). They meet the IEC/EN 61009-1 product standard (VDE 0664-20). Areas of application are household, commercial and industrial applications. The extensive range of accessories offers you everything you need for your installation tasks. Numerous approvals make the DS203NC fit for worldwide use. Dimensioning capacity ICN = 6,000 A according to IEC/EN 61009-1 (VDE 0664-20) for RCDs (residual current protection devices) in residential construction and similar applications, ICU = 10 KA according to IEC/EN 60947-2 (VDE 0660-101) for MCBS (LS) in industrial applications. RCBO DS203NC A Type A is 3-pole (LS), 4-pole switching and can be used in three-phase networks with or without N conductor.

    2-4 working days  Delivery time depending on the product. The freight forwarding goods longer after appointment. Order goods are only ordered from the manufacturer and can therefore be delayed.

    €224,91

  • ABB C11 110 - 101 MID - NeueEnergie24

    ABB ABB C11 110-101 mid

    2-4 working days  Delivery time depending on the product. The freight forwarding goods longer after appointment. Order goods are only ordered from the manufacturer and can therefore be delayed.

    AC meters for measuring single -phase networks via a direct connection for currents up to a maximum of 40 A. counter is calibrated according to mid and approved in accordance with IEC. Display of all important instrumental values. The electricity meter has an outcome. This can either be used as a pulse output for the output of the activity energy or as an alarm output. Up to 25 alarm values ​​(threshold values ​​with time delay) can be set here. The installation width is 1 DIN module. You can find suitable accessories such as electricity converters, gateways with integrated web server and a KNX interface in our portfolio.

    2-4 working days  Delivery time depending on the product. The freight forwarding goods longer after appointment. Order goods are only ordered from the manufacturer and can therefore be delayed.

    €97,58

  • ABB B23 212 - 100 YCU.00152 Drehstromzähler - NeueEnergie24

    ABB Fig B23 212-100 YCU.00152 three-phase meter

    2-4 working days  Delivery time depending on the product. The freight forwarding goods longer after appointment. Order goods are only ordered from the manufacturer and can therefore be delayed.

    The three-ladement or four-conductor rotary power meter via a direct connection up to a maximum of 65 A. The following values ​​are output via a white backlit display with up to 7 spots: activity energy (class 1) and blind energy (class 2) for import and export, services, currents, voltages (L-L, L-N), frequency, COS phi, power factor and apparent performance, both ever Phase as well as overall. Communication can be via the integrated interface RS485 (Modbus RTU) or via the infrared interface to connect a KNX module. The energy meter has an outcome. This can be used as an impulse output for output of the active or blind energy or as an alarm output. Up to 25 alarm values ​​(threshold values ​​with time delay) can be set here. The counter is calibrated according to mid and approved according to IEC. The installation width is 4 DIN modules.

    2-4 working days  Delivery time depending on the product. The freight forwarding goods longer after appointment. Order goods are only ordered from the manufacturer and can therefore be delayed.

    €320,00

  • ABB B21 312 - 100 Wechselstromzähler - NeueEnergie24

    ABB ABB B21 312-100 AC meter

    2-4 working days  Delivery time depending on the product. The freight forwarding goods longer after appointment. Order goods are only ordered from the manufacturer and can therefore be delayed.

    AC meters for measuring single-phase networks via a direct connection for currents up to a maximum of 65 A. The following values ​​are output via a seven-segment ad with up to 7 spots: activity energy (class 1) and blind energy (class 2) for import and export, power, electricity, voltage (L-n), frequency, cos phi, power factor and sham performance. Communication can be via the integrated interface RS485 (Modbus RTU) or via the infrared interface to connect a KNX module. The energy meter has 2 firmly configured inputs and outputs. The output can either be used as a pulse output to output the active or blind energy or as an alarm output. Up to 25 alarm values ​​(threshold values ​​with time delay) can be set here. The inputs are used to control the tariffs or to count external impulses. The backlockable intermediate counter enables measuring individual intervals. In addition, the counter records up to 4 tariffs. The integrated watch can be used to run time -controlled functions. The counter is calibrated according to mid and approved according to IEC. The installation width is 2 DIN modules.

    2-4 working days  Delivery time depending on the product. The freight forwarding goods longer after appointment. Order goods are only ordered from the manufacturer and can therefore be delayed.

    €260,00

  • ABB B23 311 - 100 Drehstromzähler - NeueEnergie24

    ABB Fig B23 311-100 three-phase meter

    2-4 working days  Delivery time depending on the product. The freight forwarding goods longer after appointment. Order goods are only ordered from the manufacturer and can therefore be delayed.

    Together counter for measuring a three-ladement or four-conductor rotary power network via a direct connection up to a maximum of 65 A. The following values ​​are issued via a seven-segment ad with up to 7 spots: activity energy (class 1) and blind energy (class 2) for import and export, services, currents, tensions (L-L, L-N), frequency, COS PHI, power factor and bill output, both per phase. as well as total. Communication can be via the integrated infrared interface to connect a KNX module. The energy meter has 2 firmly configured inputs and outputs. The output can either be used as a pulse output to output the active or blind energy or as an alarm output. Up to 25 alarm values ​​(threshold values ​​with time delay) can be set here. The inputs are used to control the tariffs or to count external impulses. The backlockable intermediate counter enables measuring individual intervals. In addition, the counter records up to 4 tariffs. The counter is calibrated according to mid and approved according to IEC. The installation width is 4 DIN modules.

    2-4 working days  Delivery time depending on the product. The freight forwarding goods longer after appointment. Order goods are only ordered from the manufacturer and can therefore be delayed.

    €446,25

  • ABB ZV16 - H42 - D.CWW Verbrauchereinheit - NeueEnergie24

    ABB ABB ZV16-H42-D.CWW consumer unit

    2-4 working days  Delivery time depending on the product. The freight forwarding goods longer after appointment. Order goods are only ordered from the manufacturer and can therefore be delayed.

    Distributor PV converter 1x circuit breaker B16A 1x RCBO 16A/0.03 main switch 40a

    2-4 working days  Delivery time depending on the product. The freight forwarding goods longer after appointment. Order goods are only ordered from the manufacturer and can therefore be delayed.

    €184,45

  • ABB ZV16 - H42.C.CW - NeueEnergie24

    ABB ABB ZV16-H42.c.cw

    2-4 working days  Delivery time depending on the product. The freight forwarding goods longer after appointment. Order goods are only ordered from the manufacturer and can therefore be delayed.

    Distributor PV inverter 2x Kombi size 16A / 0.03 + 1 WCD security automat 40a

    2-4 working days  Delivery time depending on the product. The freight forwarding goods longer after appointment. Order goods are only ordered from the manufacturer and can therefore be delayed.

    €164,22

  • ABB ZV16 - H42 - DM1.CWW Verbrauchereinheit - NeueEnergie24

    ABB ABB ZV16-H42-DM1.cwW consumer unit

    2-4 working days  Delivery time depending on the product. The freight forwarding goods longer after appointment. Order goods are only ordered from the manufacturer and can therefore be delayed.

    Distributor PV converter and kWh 1x circuit breaker B16A 1x RCBO 16A/0.03 main switch 40a

    2-4 working days  Delivery time depending on the product. The freight forwarding goods longer after appointment. Order goods are only ordered from the manufacturer and can therefore be delayed.

    €239,19

  • ABB ZV16 - H42.C.CW.CW Verbrauchereinheit - NeueEnergie24

    ABB ABB ZV16-H42.c.cw.cw consumer unit

    2-4 working days  Delivery time depending on the product. The freight forwarding goods longer after appointment. Order goods are only ordered from the manufacturer and can therefore be delayed.

    Distribution box for solar modules with two additional sockets

    2-4 working days  Delivery time depending on the product. The freight forwarding goods longer after appointment. Order goods are only ordered from the manufacturer and can therefore be delayed.

    €253,47

  • ABB ZV16 - H42 - CM1.CWW Verbrauchereinheit - NeueEnergie24

    ABB ABB ZV16-H42-cm1.cww consumer unit

    2-4 working days  Delivery time depending on the product. The freight forwarding goods longer after appointment. Order goods are only ordered from the manufacturer and can therefore be delayed.

    Distributor PV converter and kWh 2x RCBO 16A/0.03 main switch 40a

    2-4 working days  Delivery time depending on the product. The freight forwarding goods longer after appointment. Order goods are only ordered from the manufacturer and can therefore be delayed.

    €252,28

They have 34 from 34 Seen products

Registration

Did you forget your password?

You don't have any account yet?
Create an account